Lifting Plan Builder

Automatic operational document from Survey / SR data.

Engineering review required. This draft assists document preparation only. Actual load, lift radius, crane configuration, load chart, ground condition, lifting points and rigging must be verified and approved by competent lifting personnel before work.

Load Job / Survey

Search by SR number, customer, project or machine. Safe operational data only.

1. Project Information
2. Load Calculation
No machine data loaded. Enter the critical load below.
Gross Load0 kg
Chart Capacity0 kg
UtilisationIncomplete
AssessmentIncomplete
3. Crane & Load Chart
Geometric boom angle estimate: Enter radius and boom length. Verify the actual angle and capacity against the crane indicator and approved load chart.
4. Rigging Arrangement
Angle from HorizontalIncomplete
Included AngleIncomplete
Static Load per LegIncomplete
Rigging AssessmentIncomplete
Enter lifting point span with either sling length or hook height. Calculation assumes a symmetrical arrangement and equal load sharing.
5. Site Conditions & Controls
6. Lifting Team & Approval
7. Photos & Attachments

Survey photos are loaded automatically. Tick the images to include in the plan.

No survey photos loaded.