Gigamach

MOS Builder

Professional Method Statement for controlled site operations.
Gigamach Site is for operational documents only. MOS Builder does not show quotation price, unit price, discount, cost, profit, margin, or customer price history.

Search / Load Job

MOS Form

Project Information

Document control and safe operational information only.

Machine List

Machine dimensions are recorded in millimetres (mm).

Machine Name Weight (kg) Length (mm) Width (mm) Height (mm) Qty Notes Action

Scope of Work

Define exactly what Gigamach will perform and the work boundaries.

Manpower

Equipment / Tools

SR Resource Rules

Requirements detected during Survey / SR preparation.

Work Sequence

Arrange activities in the actual execution order.

Smart Work Sequence
Uses the scope, machines, equipment, resources, and detected job type. Review before applying.

Safety Control

State the mandatory controls that must be verified before and during work.

PPE

Emergency Contact

Notes

Document Approval

Names appear in the approval section of the generated MOS.